INTRODUCTION
There is an alarming trend in industry to discount the potential contribution of the Technical / Operations function to productivity improvement, product quality and gains in market share. Principles taught in this Process Plant Start-up, Commissioning and Troubleshooting training course will help you to understand the true nature and different techniques of problem solving and problem prevention in the operational / process environment.
Excellent Troubleshooting skills are considered a core competency for ‘Best-in-Class’ industrial companies. If your company’s goals include minimizing downtime then this training event is a must because it delivers rapid, safe Troubleshooting.
SUITABLE FOR:
This training seminar is suitable for a wide range of professionals but will greatly benefit:
- Technical personnel involved in supporting Plant Commissioning and Start-up activities;
- Supervisors and Engineers, both operations and maintenance who are involved or likely to be involved in Plant Commissioning and Start-up activities;
- Team Leaders, Project Managers, Refinery Managers, Plant Managers, Section Heads, Plant Supervisors, Process Engineers, technicians, technical staff and contractor personnel involved in project execution and plant Commissioning and Start-up in the Oil and Gas Process industry;
- Managers and specialists who lead or facilitate in the designing, selecting, specifying, operating, installing, repairing and trouble-shooting of oil and gas processing facilities;
- Mechanical, Electrical, Instrumentation and Control Engineers who are involved in Pre-commissioning, start-up and trouble shooting
OBJECTIVES:
Upon the successful completion of this seminar, participants will have a good knowledge of:
- The various activities/steps (checklists) of the pre-commissioning and commissioning of a process
- How to develop an overall commissioning strategy and plant start-up management
- How to deal with machinery and equipment specific commissioning issues
- How to manage issues dealing with the commissioning of Electrical, Instrumentation and Utilities Systems
- How to develop an overall commissioning management plan, resource planning and commissioning budget?
- Typical process plant Startup and Commissioning procedures
- Troubleshooting and Problem-Solving strategies (Case Study – Gas and Liquid Separation, Natural Gas Dehydration and Natural Gas Amine Treatment) which can be applied during commissioning for each category of equipment.
COURSE CONTENTS:
Module 1 – Introduction, Scope, General Requirement, and Preparation Prior to Start-up
- KeyTopics:
- Introduction
- Scope
- General Requirements
- Preparation Prior to Start-up
- Operational Check-Out
- Hydrostatic Testing
- Final Inspection of Vessels
- Flushing of Lines
- Flushing – Steam Piping
- Flushing – Process and Utility Piping
- Instruments
- Breaking-In Pumps
- Breaking-In Compressors
Module 2 – Preparation Prior to Start-up & Normal Plant Start-up Procedure
- KeyTopics:
- Preparation Prior to Start-up (contd.)
- Preparation Prior to Start-up
- Dry-out and boil-out.
- Catalyst loading.
- Tightness test.
- Normal Plant Start-up Procedure (Commissioning)
- General
- Pre Start-up Check List
- Plant Start-up
- Making Area Safe
- Utilities Commissioning
- Air Purging and Gas Blanketing of Non-Catalytic Sections
- Catalytic Units Reactor Section Air Purging and Gas Blanketing
- Heat Exchanger Activation
- Vacuum Test
- Establishment of Flow in the Unit
- Inhibitor/Chemical Injections
- Operation Adjustment to Obtain Quality
- Preparation Prior to Start-up (contd.)
Module 3 – Acid Cleaning, Chemical Boil-out & Heater Dry-out Procedures
- KeyTopics:
- Typical Acid Cleaning Procedure for Compressors Lines
- Preparation
- Acid-Cleaning Operation
- Typical Chemical Boil-out Sequence Procedure
- Typical Heater Dry-out Procedure
- General Procedure
- Gas Fired Heaters
- Oil Fired Heaters
- Burners
- Typical Acid Cleaning Procedure for Compressors Lines
Module 4 – Performance Guarantees
- KeyTopics:
- Scope
- Guarantee Items and Figures
- Process Performance Guarantee
- Plant capacity
- Plant Yield
- Product Specifications
- Raw Materials
- Catalyst Performance and Life
- Chemical Consumption
- Utility Consumption Guarantee
- Guarantee Items
- Guarantee Figures
- Equipment Guarantee
- Environmental Related Guarantee
- Effluent Waste Water Characteristics
- Solid Waste Characteristics
- Gaseous Waste Characteristics
- Execution of the Performance Guarantee Test
- Completion of Performance Test
- Process Performance Guarantee
Module 5 – Troubleshooting and Problem Solving
- KeyTopics:
- Oil and Gas Separation Processes
- Process Flow Sketches & Brief Description
- Potential Operational Problems
- Trouble Shooting
- Natural Gas Amine Sweetening Process
- Process Flow Sketch & Brief Description
- Potential Operation Problems
- Trouble Shooting
- Natural Gas Glycol Dehydration Process
- Process Flow Sketches & Brief Description
- Potential Operational Problems
- Trouble Shooting
- Oil and Gas Separation Processes